
(We fix it right & safe)

(We fix it right & safe)
BISHA - 2024 Process Plant maintenance


Scope of Work
- Modification of Shut (Lime project maintenance )
- Fabrication/ Welding of Slaker Base (Workshop)
- Modification of slew , Feeder, slaker Feeder (Workshop)
- Repositioning of Tank with Mobile Crane (Lime Project maintenance)
- Dismantling of Lime slaker Tank (Lime Project)
- Induction Training at Bisha
Client :
Bisha Mining Share Company
Location : Eritera
Schedule: 2024
Service Type:
Mining & Construction Services
Project Detail
Skargi Africa was engaged in the Bisha 2024 Process Plant for critical lime project maintenance and structural modifications. Our team provided expertise in fabrication, welding, dismantling, repositioning, and equipment upgrades, ensuring enhanced operational efficiency and safety.
Key Tasks & Deliverables:
Modification of Chute (Lime Project Maintenance)
- Upgraded and reinforced chute structure to improve material flow and durability.
Fabrication & Welding of Slaker Base (Workshop)
- Precision welding and fabrication of a new slaker base, ensuring structural stability and optimal performance.
Modification of Slew, Feeder, and Slaker Feeder (Workshop)
- Custom modifications to improve equipment efficiency and extend lifespan.
Repositioning of Tank with Mobile Crane (Lime Project Maintenance)
- Safe and precise relocation of the lime tank using a mobile crane to optimize plant layout and functionality.
Dismantling of Lime Slaker Tank (Lime Project)
- Careful dismantling of an old lime slaker tank for replacement and system upgrades.
Induction Training at Bisha
- Conducted safety and operational training for personnel, ensuring compliance with industry best practices and site regulations.
Outcome & Impact:
✅ Enhanced Equipment Efficiency – Upgraded systems improved overall plant performance.
✅ Increased Safety & Compliance – Implemented best practices in structural modifications and maintenance.
✅ Minimized Downtime – Efficient project execution reduced operational disruptions.
Skargi Africa remains committed to engineering excellence and industrial innovation, delivering high-quality solutions for complex mining projects.
- Process plant projects and lime storage tanks project 2023/2024 @Bisha mining
- Skargi Africa team performing Electric welding at Bisha mining fabrication workshop
- 2024 BISHA INDUCTION TRAINING FOR THE TEAM SKARGI
- BISHA PROCESS PLANT PROJECT
- BISHA MAINTENANCE - Installation of chut at mill Conveyor
- BISHA MAINTENANCE
- PROCCESS VIDEOS
- Successful case study