Bisha Mining process plant lime Storage

Scope of Work
- Du-stuffing of materials on-site
- Erecting of structural steel building
- Erecting of tanks
- Fabrication and HDPE pole welding on-site
- Installation of mechanical pumps
- Erection of scaffoldings
- Rigging and lifting on-site.
- Maintenance of work on-site
- Mining process plant lime Storage
Client :
Bisha Mining Share Company
Location : Eritera
Schedule: (2022-2023)
Service Type:
Mining & Construction Services
Scope of Work – Bisha Mining Process Plant Lime Storage Project
Unloading and Handling of Materials On-Site (De-stuffing)
- Safe offloading of project materials, including lime storage components, structural steel, HDPE pipes, and mechanical equipment.
- Inspection and verification of received materials against packing lists and specifications.
- Sorting, temporary storage, and protection of materials to prevent damage and contamination.
- Coordination with logistics and site supervisors to ensure timely delivery and movement of materials.
Erection of Structural Steel Buildings
- Assembly and installation of prefabricated steel structures for the lime storage facility.
- Alignment, bolting, and welding of structural members in accordance with engineering specifications.
- Application of corrosion protection coatings where required.
- Quality control inspections to ensure compliance with safety and industry standards.
Erection of Storage Tanks
- Assembly and installation of lime storage tanks, including base preparation and structural supports.
- Alignment, bolting, and welding of tank components to ensure structural integrity.
- Leak testing and pressure testing to verify tank performance.
- Application of protective coatings to prevent corrosion and contamination.
Fabrication and On-Site HDPE Pole Welding
- Cutting, shaping, and welding of HDPE pipes and fittings to support lime processing operations.
- Installation of HDPE pipelines for slurry or chemical transport within the plant.
- Pressure testing and integrity checks to ensure leak-proof connections.
- Compliance with industry standards for HDPE welding and jointing techniques.
Installation of Mechanical Pumps
- Positioning and alignment of mechanical pumps used in lime slurry and fluid transfer.
- Piping connection, bolting, and integration with plant processing systems.
- Testing and commissioning of pumps to ensure optimal performance.
- Routine maintenance and troubleshooting of installed pumps.
Erection of Scaffolding Systems
- Supply, assembly, and installation of scaffolding for structural works, tank erection, and maintenance access.
- Compliance with OSHA and site-specific safety standards for working at heights.
- Load testing and certification of scaffolding before use.
- Dismantling and removal of scaffolding upon project completion.
Rigging and Lifting Operations On-Site
- Planning and execution of rigging activities for heavy equipment, tanks, and structural components.
- Use of cranes, chain blocks, and hoisting equipment for safe lifting.
- Load balancing and securing to prevent hazards during lifting operations.
- Coordination with certified riggers to ensure safety and efficiency.
On-Site Maintenance and Repair Works
- Routine and preventive maintenance of installed structures, pipelines, and mechanical systems.
- Troubleshooting and repair of pumps, HDPE pipelines, and structural components.
- Emergency maintenance services to minimize downtime.
- Compliance with plant maintenance schedules and reporting requirements.
The Bisha Mining Process Plant Lime Storage Project ensures:
- Efficient Lime Handling – Secure storage and smooth transport of lime for mining operations.
- Structural Stability – Safe and durable erection of buildings and tanks.
- Reliable Pumping & Piping – Leak-proof and corrosion-resistant fluid transfer systems.
- Safe Material Handling – Proper unloading, rigging, and lifting of equipment.
- Workplace Safety – Compliance with health and safety standards.
- Operational Reliability – Preventive maintenance to minimize downtime.
- Environmental Compliance – Safe lime storage and reduced environmental impact.