Kibali Gold Mine

Scope of Work
Client :
DRA, Group 5 projects as a Sub Contractor
Location : Republic of Congo DRC, Doko Town
Schedule: (2012-2015)
Service Type:
Mining & Construction Services
Scope of Work – Kibali Gold Mine Project
Structural Steel Erection of Crusher Platform & Installation of Mechanical Items
- Fabrication and installation of steel structures for the crusher platform, ensuring stability and durability.
- Lifting and positioning of steel beams, columns, and support structures.
- Secure installation of mechanical equipment, including chutes, liners, and impact plates.
- Alignment and bolting/welding of structural and mechanical components for optimal crusher performance.
Erection of Stockpile Tunnel
- Assembly and installation of structural steel frameworks for the stockpile tunnel.
- Reinforcement of tunnel walls and roofing to withstand high material loads.
- Integration of access walkways, safety railings, and maintenance platforms.
- Structural testing and quality control inspections to ensure compliance with mining safety standards.
Apron Feeders Platform Construction
- Fabrication and installation of a platform for apron feeders, ensuring stability for material handling.
- Positioning and securing of structural steel components for feeder support.
- Integration of access stairs, platforms, and handrails for maintenance personnel.
- Load-bearing analysis and reinforcement for heavy-duty operations.
Installation of Mechanical Apron Feeders and Plate Works
- Placement and secure installation of apron feeders for controlled material flow.
- Alignment and bolting of mechanical components, including drive systems, rollers, and chains.
- Installation of plate works, including wear plates and liners for impact resistance.
- Testing and commissioning to ensure smooth operation and efficiency.
Erecting and Installation of Conveyors
- Fabrication and erection of conveyor systems for ore and material transport.
- Installation of conveyor belts, idlers, pulleys, and tensioning systems.
- Alignment and testing of conveyors to ensure optimal material flow.
- Integration of safety guards, chutes, and transfer points to prevent material spillage.
Fabrication and Modification Works
- On-site fabrication of steel components, including custom modifications.
- Welding, cutting, and reinforcement of structures to meet project specifications.
- Adjustments and realignments to improve efficiency and durability.
- Application of protective coatings to prevent corrosion and wear.
HDPE Pipe Welding and Plant Pipe Fitting Works
- Welding and fabrication of HDPE pipes for fluid and slurry transportation.
- Use of butt fusion, electrofusion, and extrusion welding techniques to ensure leak-proof connections.
- Pipe fitting for water, slurry, and compressed air systems within the plant.
- Hydrostatic pressure testing to confirm pipeline integrity before commissioning.
The Kibali Gold Mine Project ensures:
- Enhanced Material Handling Efficiency – Installation of apron feeders, conveyors, and stockpile tunnels for smooth ore transportation.
- Strong and Stable Infrastructure – Structural steel erection for the crusher platform and support systems to withstand mining operations.
- Seamless Mechanical Integration – Proper alignment and installation of mechanical components to optimize performance and minimize downtime.
- Durable and Leak-Proof Piping Systems – HDPE welding and pipe fitting to ensure efficient fluid and slurry transport across the plant.
- Operational Safety and Compliance – Adherence to industry standards for fabrication, lifting, and structural integrity.
- Increased Production Capacity – Improved processing capabilities through well-integrated material flow systems.
- Long-Term Reliability – Structural modifications and reinforcements to sustain mining operations over time.
- PROGRESS PICTURES & VIDEOS OF PROJECT