Alufer Bauxite Mining

Scope of Work

Client :

DRA, Group 5 projects as  a Sub Contractor  Skargi-Africa   

Location : Guinea, West Africa

Schedule: (2017-2018) 

Service Type:

Mining & Construction Services

Scope of Work – Alufer Guinea Mining Bauxite Project
  1. Steel Erection of Crusher Structural Building

    • Fabrication, assembly, and installation of structural steel components for the crusher building.
    • Alignment and secure bolting/welding of steel framework to support the crusher machinery.
    • Application of protective coatings for durability in harsh mining conditions.
    • Structural load testing and quality inspections to ensure compliance with engineering standards.
  2. Installation of Mechanical Pumps

    • Positioning and alignment of pumps for material handling and slurry transport.
    • Integration of pumps with pipeline networks, valves, and control systems.
    • Testing and commissioning to ensure optimal pump performance.
    • Routine maintenance and troubleshooting to prevent operational downtime.
  3. Steel Erection and Installation of Stockpile Conveyor

    • Assembly and installation of steel structures to support the stockpile conveyor system.
    • Alignment and securing of conveyor trusses, supports, and walkways.
    • Installation of conveyor belts, rollers, and tensioning systems for efficient material transport.
    • Testing and commissioning to ensure smooth conveyor operations.
  4. Erection of Stockpile Tunnel and Apron Feeder Platform

    • Construction of underground and above-ground structural supports for stockpile tunnels.
    • Installation of platforms, beams, and access points for apron feeder maintenance.
    • Structural reinforcement to handle heavy load capacities.
    • Ensuring compliance with safety and engineering standards.
  5. Installation of Stockpile Apron Feeders, Mechanical Pumps, and Platework

    • Placement and secure installation of apron feeders for controlled material flow.
    • Integration of apron feeders with conveyor and stockpile systems.
    • Installation of mechanical pumps for fluid transfer and dust suppression.
    • Fabrication and fitting of platework for chutes, bins, and impact areas.
  6. Installation of Structural Stagger

    • Assembly and installation of staggered structural elements to reinforce plant infrastructure.
    • Alignment, bolting, and welding of staggered steel components.
    • Load distribution analysis to optimize weight handling and stability.
    • Final inspection and commissioning to ensure operational readiness.