Ashley Ventilation Underground Project

Scope of Work

Client :

Bisha Mining Share Company

Location : Eritera

Schedule: 2025

Service Type:

Mining & Construction Services

Project Detail

Ashley Ventilation Underground Project – Fabrication and Installation of Section 1 & 2 Joints with Transmission Piece

Objective:

To enhance underground ventilation efficiency by fabricating, installing, aligning, and welding joint sections and transmission components, ensuring proper structural stability and airflow performance.

Scope of Work:

  1. Fabrication

    • Fabricate ventilation joints and transmission piece components according to project specifications.

    • Ensure dimensional accuracy and quality control before transporting fabricated pieces underground.

  2. Joint Installation

    • Install six (6) joints in Section 1.

    • Install six (6) joints in Section 2.

    • Verify fit-up, alignment, and readiness for welding.

  3. Transmission Piece Installation

    • Fabricate and install an additional transmission piece in Section 1 to enhance ventilation flow.

    • Secure transmission piece to existing structure and check for stability.

  4. Rail Work

    • Complete alignment and preparation of rails in both sections.

    • Section 1 rail: fully prepared and ready for welding.

    • Section 2 rail: in alignment stage pending welding.

  5. Welding & Quality Assurance

    • Weld fabricated joints and rail sections to ensure durability.

    • Conduct non-destructive testing (NDT) or inspection where applicable.

    • Ensure welding conforms to safety and engineering standards.

  6. Progress Tracking

    • Record daily progress including fabrication, installation, alignment, and welding.

    • Document completion milestones for reporting to project supervisors.

Deliverables:

  • Fabricated and installed six joints in Section 1.

  • Fabricated and installed six joints in Section 2.

  • Fabricated and integrated additional transmission piece in Section 1.

  • Section 1 rail welded and secured.

  • Section 2 rail aligned and prepared for final welding.

  • Progress and quality control reports..