BISHA 2025 Quicklime Project
Scope of Work
- Modification of Shut (Lime project maintenance )
- Fabrication/ Welding of Slaker Base (Workshop)
- Modification of slew , Feeder, slaker Feeder (Workshop)
- Repositioning of Tank with Mobile Crane (Lime Project maintenance)
- Dismantling of Lime slaker Tank (Lime Project)
- Induction Training at Bisha
Client :
Bisha Mining Share Company
Location : Eritera
Schedule: 2025
Service Type:
Mining & Construction Services
Project Detail
Skargi Africa was engaged in the Bisha 2024 Process Plant for critical lime project maintenance and structural modifications. Our team provided expertise in fabrication, welding, dismantling, repositioning, electrical works, instrumentation, and equipment upgrades, ensuring enhanced operational efficiency and safety.
Key Tasks & Deliverables
Modification of Chute (Lime Project Maintenance)
Upgraded and reinforced chute structure to improve material flow and durability.
Fabrication & Welding of Slaker Base (Workshop)
Precision welding and fabrication of a new slaker base, ensuring structural stability and optimal performance.
Modification of Slew, Feeder, and Slaker Feeder (Workshop)
Custom modifications to improve equipment efficiency and extend lifespan.
Repositioning of Tank with Mobile Crane (Lime Project Maintenance)
Safe and precise relocation of the lime tank using a mobile crane to optimize plant layout and functionality.
Dismantling of Lime Slaker Tank (Lime Project)
Careful dismantling of an old lime slaker tank for replacement and system upgrades.
Electrical & Instrumentation Works
Installation and termination of power and control cabling for slaker systems.
Calibration of flow meters, sensors, and control loops to ensure process accuracy.
Testing and commissioning of motor control panels and instrumentation devices for seamless plant operations.
Induction Training at Bisha
Conducted safety and operational training for personnel, ensuring compliance with industry best practices and site regulations.
Outcome & Impact
✅ Enhanced Equipment Efficiency – Upgraded systems and E&I works improved overall plant performance.
✅ Increased Safety & Compliance – Implementation of electrical safety standards and instrumentation checks ensured operational reliability.
✅ Minimized Downtime – Efficient project execution reduced operational disruptions.
Skargi Africa remains committed to engineering excellence and industrial innovation, delivering high-quality mechanical, structural, and electrical & instrumentation solutions for complex mining projects.
- New maintenance and Quicklime projects works for BISHA MINING SHARE
- Electrical & Instrumentation (E&I) Engineering
Powering operations with reliable electrical systems and precision instrumentation.