Burkina Faso Rox Gold Mines

Scope of Work

Client :

DRA, Group 5 projects as  a Sub Contractor  Skargi-Africa 

Location : Burkina Faso, West Africa

Schedule:  (2015-2017)  

Service Type:

Mining & Construction Services

Scope of Work – Burkina Faso Rox Gold Mine Project
  1. Erecting of CIL (Carbon in Leach) Platform and Installation

    • Fabrication and erection of CIL platform, including support beams, columns, and safety rails.
    • Installation of mechanical components, such as conveyors, chutes, and agitators, to facilitate the leaching process.
    • Alignment and integration of tanks, piping, and pumps to ensure seamless flow during the gold extraction process.
    • Testing and commissioning to verify operational performance and structural integrity.
  2. Steel Erection of Gold House; Structural and Mechanical Installation

    • Fabrication and installation of structural steel for the Gold House, including columns, beams, and frames.
    • Integration of mechanical systems within the Gold House, such as crushers, conveyors, and material handling equipment.
    • HDPE ROLO welding for pipeline connections to ensure leak-proof and durable systems.
    • Fabrication and fitting of pipes for fluid transfer, slurry systems, and compressed air networks.
    • Installation of purlins, roof sheeting, and crowding for structural and weather protection.
    • Quality control and testing of all installations to ensure compliance with mining standards.
  3. Installation of Stockpile Steel Platform and Mechanical Apron Feeders in the Stockpile Tunnel

    • Assembly and installation of steel platforms for the stockpile area to provide safe access for maintenance and operation.
    • Positioning and securing of mechanical apron feeders for controlled material flow within the stockpile tunnel.
    • Integration of feeders with conveyors and material handling systems to optimize the transportation of ore.
    • Reinforcement of platform structures to handle high-load capacities and operational wear.
    • Testing and commissioning of feeders for reliable material transfer.
  4. Erecting of Structural Steel for Mill Building

    • Fabrication and erection of structural steel components for the Mill Building, including beams, columns, and framework.
    • Alignment and welding of steel components to provide structural support for the mill’s equipment and systems.
    • Integration of mill machinery, including crushers, mills, and grinders, with the steel framework.
    • Installation of walkways, access platforms, and safety rails to ensure safe maintenance access.
    • Application of corrosion-resistant coatings for protection in the mining environment.

This scope ensures efficient material handling, robust infrastructure, and seamless integration of mechanical and structural components, all contributing to optimized operations at the Rox Gold Mine in Burkina Faso