Ghana KIPP CEN Power

Scope of Work

Client :

 CEN Power, Group five and Skargi-Africa as  a Sub Contractor 

Location : Eritera

Schedule: (2017-2023) 

Service Type:

Mining & Construction Services

Project Detail

Project Details: Steel Erection & Fabrication Works

Project Scope:

This project involves comprehensive steel erection, welding, and mechanical installations to support the development of an industrial power facility. The scope includes:

  1. Steel Erection for Steam Turbine:

    • Assembly and installation of structural steel components for the steam turbine.
    • Precision alignment and bolting of steel frameworks.
  2. Building 1 & 2 – Welding of Steel Pipes and HDPE Poles:

    • Welding and installation of high-strength steel pipes.
    • Fabrication and welding of HDPE poles to support infrastructure requirements.
  3. Installation of Purlins & Mechanical Pumps:

    • Placement and securing of purlins to reinforce roofing structures.
    • Installation of mechanical pumps to support operational efficiency.
  4. Fabrication and Boiler Making Works (Workshop):

    • Cutting, shaping, and assembling steel components for boiler systems.
    • Manufacturing and welding of custom steel structures.
  5. Erection of Structural Steel for Mill Building:

    • Lifting and installation of steel framework for the mill building.
    • Structural reinforcement to support heavy machinery and equipment.

This project ensures precision engineering, adherence to safety standards, and the highest quality fabrication and installation to enhance the facility’s operational capacity.